I have this setup:
- Build 1 builds and trigger Release 1 when finished
- Build 2 is triggered by Build 1 and release Release 2
If I have one parallel job, can I be sure that:
- Release 1 is always run before the Build 2 is triggered?
I have tested this, and it does the above, but I can't find any documentation on the flow anywhere.
I need to release Release 1 before build 2 starts.